Water and transportation disruptions have occurred on the right bank of Kyiv
Due to power supply issues in Kyiv on October 7, water pumping stations were partially left without power, resulting in water supply disruptions on the right bank of the capital. In addition, due to a power outage in the overhead contact system on the right bank of the city, electric transit service has been temporarily suspended and the funicular has been shut down.
The temporary restrictions on electric transit did not affect the Obolon district or the Vynogradar residential area, where service is operating as usual. Energy service specialists are already working to restore power to infrastructure facilities.
This was reported by the official channel of the Kyiv City State Administration.
As a reminder, at least two people were killed in Kyiv as a result of the nighttime attack.
Earlier, the Northern Bridge in Kyiv, which had been damaged by a drone, was repaired.
On the morning of October 4, during a drone attack, a Russian suicide drone exploded on the roadway of the North Bridge in Kyiv.